OFS move script on timeline

I found a better video that starts at another keyframe. How do I move the whole script on the timeline to fit the new video?

Select the whole script and use shift + arrow keys to move them. Or, cut the entire script and paste at the starting point of the desired position.

Alternatively, use the TimeOffset feature in the Utils extension:

4 Likes

Thank you!

I’ve found it tedious to either hold the arrow for a while or do duration calculations, wish there was a plugin that enabled dragging all selected points with the mouse.
But I wasn’t aware of that feature in OG9’s extension, very useful! Thanks for pointing to that!

1 Like

Sounds like ctrl-x ctrl-v is the easiest way and then adjusting to the right frame.

This topic was automatically closed 3 days after the last reply. New replies are no longer allowed.